Installation guide

Installing a 600×600 suspended ceiling, step by step

Installing a demountable ceiling is fast and clean: a suspended grid, then tiles simply laid in. Here is the method we have practised for over 25 years.

Tools & supplies

  • Laser level and chalk line
  • Drill, anchors and screws
  • Perimeter angle trims (L)
  • Hangers and threaded rods
  • T24 main runners (3,600 mm)
  • T24 cross tees (1,200 and 600 mm)
  • STRUKTALYS 600×600 tiles
  • Shears / nibbler for cuts
Installation guide
01

Survey & marking

Set the plenum height (allow 10–20 cm below ducts and obstacles) and laser-mark the finished level on the walls.

02

Perimeter trims

Fix the L angles along the line, anchored every 30–50 cm. They will carry the edge tiles.

03

Hangers

Fix hangers to the structural ceiling on a grid of roughly 1,200 × 1,200 mm.

04

T24 main runners

Hang the 3,600 mm runners from the hangers, 1,200 mm apart, aligned with a string line.

05

Cross tees

Clip the 1,200 mm tees between runners, then the 600 mm tees to close the 600×600 grid.

06

Levelling

Adjust every hanger with the laser: the grid must be perfectly flat before laying a single tile.

07

Laying the tiles

Tilt each tile through the grid and lay it flat. Start with full rows, finish with the edge cuts.

STRUKTALYS

STRUKTALYS tips

  • Handle tiles with clean gloves to avoid marks.
  • Integrate 600×600 light fittings and grilles directly into the grid.
  • In humid rooms our lacquered galvanized tiles hold up — just check plenum ventilation.
  • In Constantine, installation by our team can be arranged for regular customers — elsewhere, this guide and a good installer are all you need.

A project to cover?

Send us the surface area and the wilaya: you'll get the wholesale price and lead time within minutes. Your truck is loaded directly at our Constantine factory.

Request a quote
WhatsApp quote